Project

General

Profile

MNDeployment #4115

UTK Institutional Repository

Added by Bruce Wilson about 11 years ago. Updated over 6 years ago.

Status:
Deferred
Priority:
Normal
Assignee:
-
Target version:
-
Start date:
2014-08-19
Due date:
2015-09-30
% Done:

0%

Latitude:
35.96
Longitude:
83.92
MN Description:
Base URL:
NodeIdentifier:
MN Tier:
Tier 1
Software stack:
DSpace
MN_Date_Online:
Name:
Logo URL:
Date Upcoming:
Date Deprecated:
Information URL:
Version:
Sprint:

Description

UTK is in process of replacing TRACE with a system to manage both data and metadata. Currently, they expect that DSpace is the likely technology for an institutional repository, and they intend for this to to be a DataONE MN.


Related issues

Blocked by Infrastructure - Story #3707: DSpace Member Node Implementation Rejected

History

#1 Updated by Laura Moyers over 10 years ago

  • Due date set to 2014-10-31
  • MN Tier set to Tier 1
  • Longitude set to 83.92
  • Latitude set to 35.96
  • Start date set to 2014-08-19
  • Target version set to Deploy by end of Y1Q1
  • Status changed from New to Planning

Intent is to develop a DSpace-based institutional repository at the University of Tennessee-Knoxville as a proof-of-concept.

#2 Updated by Laura Moyers about 10 years ago

  • Target version changed from Deploy by end of Y1Q1 to Deploy by end of NCTE

#3 Updated by Laura Moyers about 10 years ago

  • Target version changed from Deploy by end of NCTE to Deploy by end of Y1Q4
  • Due date changed from 2014-10-31 to 2015-09-30

Subcontract effort has implemented a DSpace "MN" in the sandbox environment.

#4 Updated by Laura Moyers almost 10 years ago

  • % Done changed from 0 to 10
  • Target version deleted (Deploy by end of Y1Q4)

Removed from current year targets - MN development relies upon the UTK institutional repository being up and running, and it is still in the early development stages.

#5 Updated by Bruce Wilson over 9 years ago

  • Status changed from Planning to Deferred

#6 Updated by Laura Moyers about 9 years ago

  • Assignee changed from Bruce Wilson to Laura Moyers
  • % Done changed from 10 to 0
  • Status changed from Deferred to New

Chris Eaker said via email 11/19/15 that the UTK repo is up and running. Laura to work with Chris on the DataONE MN side of this effort. Volume of content will be small.

#7 Updated by Amy Forrester over 6 years ago

  • Status changed from New to Deferred
  • Assignee deleted (Laura Moyers)
  • per LT meeting 4/13/18

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 14.8 MB)