Project

General

Profile

Task #8547

Updated by Amy Forrester almost 6 years ago

Upon MN completion of MN Description Worksheet, meet to determine operational and technical feasibility.
[CAS_CERN [Chinese ERN Work Plan Template](https://docs.google.com/document/d/15Hnf69R0J2O0Avywm40BC5kamIWJMUpfFmGwK2E9iaE/edit?usp=sharing)

Addresses:
**Operational Feasibility**:
* Repository meets sustainability expectations.

**Technical Feasibility**:

* What data will be exposed?
* Content mutability.
* Software needs:
* DataONE software stack or implement new web service in existing applications (custom stack)?
* Full repository or Slender Node?
* metadata only or science data + replication?
* Repository's in-house preferences? (Java? Python?)
* Consistency of metadata quality.
* Level of functionality (tier).
* Confirm chosen deployment path.
* Communicate knowledge of technical requirements for selected deployment. These can include:
* SSL certificate.
* FQDN.
* Apache web server with Python 2.7 or Java (depending on stack).
* Confirm metadata format. Communicate expectations for metadata quality.
* Specify in advance whether a separate test installation will be maintained in parallel with production. This is important for planning the deployment. A separate test will need distinct subdomain and SSL cert if not using wildcard.

**Metadata validation**:
* Receive and validate sample metadata records from member node.

## Approval of Plan = Change Status > Testing

Back

Add picture from clipboard (Maximum size: 14.8 MB)