Task #8661
MNDeployment #8035: IEDA_EarthChem Library (Interdisciplinary Earth Data Alliance)
Story #8660: (IEDA) Move to production
(IEDA) Implement in Production Environment
Start date:
2018-07-26
Due date:
% Done:
100%
Story Points:
Sprint:
Description
Ensure that the production version of the MN is ready. This is either a new instance with production content, or the test instance that has been completely cleaned (content and logs).
- ! Disable Sync if re-using test software !
- Software Configurations / Node Document / System Metadata checks:
- URI in node software config shows production version
- If applicable, adapter metadata reflects production URI too.
- System metadata reflects production URI
- Target CN is production hostname.
- Register Contact Subject identity in production version of DataONE LDAP w/ Sign in Link at https://search.dataone.org
- D1 admin approves contact subject in production LDAP.
- Request production certificates with prod version of URI and download w/ NCEAS uid. Install.
History
#2 Updated by Amy Forrester almost 6 years ago
- % Done changed from 0 to 100
- Assignee set to Amy Forrester
- Status changed from New to Closed