Project

General

Profile

Task #3777

MNDeployment #3118: Dryad Member Node

inconsistent checksums for some objects

Added by Rob Nahf over 11 years ago. Updated almost 11 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Ryan Scherle
Target version:
Start date:
2013-05-22
Due date:
% Done:

100%

Story Points:
Sprint:

Description

In two cases I found that the calculated checksum to have an extra zero in the checksum string compared to what is in the system metadata. In two other cases, they match, so I think this might be a legacy issue. The problem is that these will not synchronize because the checksum calculated will not match what's in the systemmetadata.

The two that fail:

http:/dx.doi.org/10.5061/dryad.70?format=d1rem&ver=2011-07-28T14:34:13.168-0400
b87fa23ca4407ba079976fb514d1dcb (in sysmeta)
vs.
b87fa23ca4407ba079976fb514d10dcb (calculated)

and

http://dx.doi.org/10.5061/dryad.12?format=d1rem&ver=2011-08-02T16:00:05.530-0400
226c2c569ef5d02446455e79ea578d6 (in sysmeta)
vs.
226c2c569ef5d002446455e79ea578d6 (calculated)

The two that pass

http://dx.doi.org/10.5061/dryad.k41qk/7/bitstream
5a5b8699e3f995c37a700a55807f96d4 (in sysmeta)
vs.
5a5b8699e3f995c37a700a55807f96d4

http:/dx.doi.org/10.5061/dryad.8665?format=d1rem&ver=2012-05-08T12:02:17.492-0400
b117822fd5934c10a27d68c8d5652d53
vs.
b117822fd5934c10a27d68c8d5652d53

History

#1 Updated by Ryan Scherle over 11 years ago

This is now fixed on the dev server. Will be updated on production server later today.

#2 Updated by Ryan Scherle over 11 years ago

  • Status changed from New to Closed
  • translation missing: en.field_remaining_hours set to 0.0

Now fixed on production.

#3 Updated by Matthew Jones over 11 years ago

  • Target version changed from Deploy by RSV to Deploy by end of Y4Q4

#4 Updated by Bruce Wilson over 11 years ago

  • Target version changed from Deploy by end of Y4Q4 to Deploy by end of Y5Q2

#5 Updated by Laura Moyers almost 11 years ago

  • Target version changed from Deploy by end of Y5Q2 to Deploy by end of Y5Q3

#6 Updated by Laura Moyers almost 11 years ago

  • Target version changed from Deploy by end of Y5Q3 to Operational

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 14.8 MB)