Task #2573
Story #2560: Prepare Staging for LT evaluation
install CN stack on cn-staging-ucsb-1
Start date:
2012-04-04
Due date:
% Done:
100%
Milestone:
CCI-1.0.0
Product Version:
*
Story Points:
Sprint:
Description
The CN software stack needs to be installed on cn-staging-ucsb-1
Should use the unstable channel for packages
All installs should be made from packages, with no "quick fixes" dropped in (goal is to operate staging only from code that is under revision control)
History
#1 Updated by Chris Jones over 12 years ago
- Status changed from New to Closed
Robert actually installed the CN stack on cn-stage-orc-1 for evaluation, so I'm closing out this ticket.