Project

General

Profile

Story #2560

Prepare Staging for LT evaluation

Added by Dave Vieglais over 12 years ago. Updated over 12 years ago.

Status:
Closed
Priority:
High
Assignee:
Category:
Environment.Production
Start date:
2012-04-02
Due date:
% Done:

100%

Story Points:
Sprint:

Description

The staging environment needs to be prepared for evaluation by the DataONE leadership team.

The current plan is to operate Staging with a single CN so that evaluation can continue in parallel with ongoing development in the sandbox environment, especially with respect to resolving the issues with maintenance of consistency between the CNs.

Staging should be composed of the following nodes:

cn-stage-ucsb-1.dataone.org (existing VM, needs CN stack installed)
mn-stage-ucsb-1.dataone.org (existing VM, metacat) 12 CPU, 24GB RAM, 2.2TB disk
mn-stage-ucsb-3.dataone.org (existing VM, metacat) 4 CPU, 8GB RAM, 22GB disk
mn-stage-unm-1.dataone.org (new VM, metacat or gmn)
mn-stage-orc-1.dataone.org (existing VM, gmn) 4cpu, 32gb RAM 132GB disk

With the RR DNS entry:

cn-stage.dataone.org (single target)


Subtasks

Task #2561: Create Staging RR DNS to refer only to UCSB-1ClosedNick Outin

Task #2562: Purge CN staging MNs and populate with approx 500 knb recordsClosedBen Leinfelder

Task #2563: Ensure postgres is configured for auth management on cn-stage-ucsb-1ClosedBen Leinfelder

Task #2573: install CN stack on cn-staging-ucsb-1ClosedRobert Waltz

Task #2574: Create mn-stage-unm-1.dataone.orgClosedDave Vieglais

Task #2581: Create DNS entry for mn-stage-unm-1ClosedNick Outin

History

#1 Updated by Dave Vieglais over 12 years ago

  • Subject changed from Prepare sandbox for LT evaluation to Prepare Staging for LT evaluation
  • Assignee changed from Ben Leinfelder to Chris Jones
  • Target version set to Sprint-2012.11-Block.2.2

#2 Updated by Chris Jones over 12 years ago

  • Status changed from New to In Progress

The stage environment is installed, so far with 1 CN and 3 MNs (with GMN installed on mn-stage-orc-1). I'll wait to close this when the subtasks are closed. For #2573, the CN was installed on cn-stage-orc-1 (not ucsb)

#3 Updated by Chris Jones over 12 years ago

  • Status changed from In Progress to Closed

All subtasks were completed and the stage env was evaluated by the Leadership Team.

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 14.8 MB)