Task #8730
Updated by Amy Forrester about 6 years ago
## If the repository and DataONE have agreed to proceed with deployment as a member node. Decisions will be made as to how to proceed with development. Node operators will receive training.
[NCAR [MN Work Plan](https://docs.google.com/document/d/1sIw8IfBwMNP4Ms0cVPzd4DtCBTtjy9wX50W9XJalDP0/edit?usp=sharing) Plan Template](https://docs.google.com/document/d/1O7MJOgdyndikWylNotkdCVwwNyxDG67Q1WVAxB3zDf4/edit?usp=sharing)
* Confirm chosen deployment path.
* Communicate knowledge of technical requirements for selected deployment. These can include:
* SSL certificate.
* fully qualified domain name (FQDN.) URLs, to identify the host machine. url has a protocol + FQDN + service path.
so `https://cn.dataone.org/cn` is a baseurl containing the FQDN of `cn.dataone.org`
(`https:` being the protocol)
* Apache web server with Python 2.7 or Java (depending on stack).
* Confirm metadata format. Communicate expectations for metadata quality.
* Specify in advance whether a separate test installation will be maintained in parallel with production. This is important for planning the deployment. A separate test will need distinct subdomain and SSL cert if not using wildcard.
(present potential Member Node with Plan and confirm mutual acceptance)
### Approval of Plan = Change Status > Testing
[NCAR [MN Work Plan](https://docs.google.com/document/d/1sIw8IfBwMNP4Ms0cVPzd4DtCBTtjy9wX50W9XJalDP0/edit?usp=sharing) Plan Template](https://docs.google.com/document/d/1O7MJOgdyndikWylNotkdCVwwNyxDG67Q1WVAxB3zDf4/edit?usp=sharing)
* Confirm chosen deployment path.
* Communicate knowledge of technical requirements for selected deployment. These can include:
* SSL certificate.
* fully qualified domain name (FQDN.) URLs, to identify the host machine. url has a protocol + FQDN + service path.
so `https://cn.dataone.org/cn` is a baseurl containing the FQDN of `cn.dataone.org`
(`https:` being the protocol)
* Apache web server with Python 2.7 or Java (depending on stack).
* Confirm metadata format. Communicate expectations for metadata quality.
* Specify in advance whether a separate test installation will be maintained in parallel with production. This is important for planning the deployment. A separate test will need distinct subdomain and SSL cert if not using wildcard.
(present potential Member Node with Plan and confirm mutual acceptance)
### Approval of Plan = Change Status > Testing