Project

General

Profile

Task #8688

MNDeployment #5451: Cary Institute (via Figshare)

Story #8687: Move to Production (Cary/figshare)

Implement in Production Environment (Cary Institute)

Added by Amy Forrester about 6 years ago. Updated over 5 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Target version:
-
Start date:
2018-08-24
Due date:
% Done:

100%

Story Points:

Description

Ensure that the production version of the MN is ready. This is either a new instance with production content, or the test instance that has been completely cleaned (content and logs).

  • ! Disable Sync if re-using test software !
  • Software Configurations / Node Document / System Metadata checks:
    • URI in node software config shows production version
    • If applicable, adapter metadata reflects production URI too.
    • System metadata reflects production URI
    • Target CN is production hostname.
  • Register Contact Subject identity in production version of DataONE LDAP w/ Sign in Link at https://search.dataone.org
  • D1 admin approves contact subject in production LDAP.
  • Request production certificates with prod version of URI and download w/ NCEAS uid. Install.

History

#1 Updated by Amy Forrester over 5 years ago

  • % Done changed from 0 to 100
  • Assignee set to Amy Forrester
  • Status changed from New to Closed

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 14.8 MB)