Task #8508
MNDeployment #7895: Pangaea
Story #8260: (Pangaea) Move to Production
Implement in Production Environment
Start date:
2018-03-20
Due date:
% Done:
100%
Story Points:
Sprint:
Description
Ensure that the production version of the MN is ready. This is either a new instance with production content, or the test instance that has been completely cleaned (content and logs).
! Disable Sync if re-using test software !
- Software Configurations / Node Document / System Metadata checks:
- URI in node software config shows production version
- If applicable, adapter metadata reflects production URI too.
- System metadata reflects production URI
- Target CN is production hostname.
Register Contact Subject identity in production version of DataONE LDAP w/ Sign in Link at https://search.dataone.org
D1 admin approves contact subject in production LDAP.
Request production certificates with prod version of URI and download w/ NCEAS uid. Install.
History
#1 Updated by Amy Forrester over 6 years ago
- Assignee set to Dave Vieglais
#2 Updated by Dave Vieglais over 6 years ago
- % Done changed from 0 to 100
- Status changed from New to Closed