Project

General

Profile

Task #7471

The v2 services don't show up for cn node at cn/v2/node

Added by Jing Tao about 9 years ago. Updated over 8 years ago.

Status:
Closed
Priority:
Urgent
Assignee:
Robert Waltz
Category:
d1_cn_buildout
Target version:
Start date:
2015-11-06
Due date:
% Done:

100%

Milestone:
None
Product Version:
*
Story Points:
Sprint:

Description

On this url:
https://cn-dev-2.test.dataone.org/cn/v2/node

You will see there are only v1 services for cn nodes. Actually the three cns have the v2 version services. But the v2 version services show up for some member nodes.

Sandbox-v2NodeService.ldif (7.87 KB) Robert Waltz, 2015-11-17 15:32

Stage-v2NodeService.ldif (7.74 KB) Robert Waltz, 2015-11-17 15:32

Dev-v2NodeService.ldif (7.62 KB) Robert Waltz, 2015-11-17 15:32

Dev2-v2NodeService.ldif (5.72 KB) Robert Waltz, 2015-11-17 15:32

Prod-v2NodeService.ldif (7.43 KB) Robert Waltz, 2015-11-17 15:32

Associated revisions

Revision 18272
Added by Robert Waltz over 8 years ago

refs #7471

Adding in all the v2 services to the ldifs that were added into openldap previously before release of v2

History

#1 Updated by Jing Tao about 9 years ago

  • Assignee set to Robert Waltz

#2 Updated by Jing Tao about 9 years ago

This url maybe more helpful:
https://cn-dev-2.test.dataone.org/cn/

#3 Updated by Robert Waltz about 9 years ago

  • % Done changed from 0 to 30
  • Category set to d1_cn_buildout
  • Status changed from New to In Progress
  • Priority changed from Normal to Urgent

#4 Updated by Robert Waltz about 9 years ago

Attached are ldif files that will create the v2 service descriptions for the Production, Stage, Sandbox, Dev and Dev2 environments.

Sandbox, Dev and Dev2 have already had the ldifs applied.

Stage and Production will need to be added after v2 packages have been upgraded.

in order to upgrade, run this command:

ldapadd -c -D cn=admin,dc=dataone,dc=org -W -H ldap://localhost:389 -x -f

#5 Updated by Skye Roseboom almost 9 years ago

This has been done for sandbox, stage-1, and production

#6 Updated by Robert Waltz over 8 years ago

  • translation missing: en.field_remaining_hours set to 0.0
  • % Done changed from 30 to 100
  • Status changed from In Progress to Closed

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 14.8 MB)