Project

General

Profile

Story #3454

1.1 Release

Added by Robert Waltz almost 12 years ago. Updated almost 12 years ago.

Status:
Closed
Priority:
High
Assignee:
Category:
Support Operations
Start date:
2013-01-07
Due date:
2013-01-07
% Done:

100%

Story Points:
Sprint:

Subtasks

Task #3455: Verify Bug fixes/Feature releasesClosedChris Jones

Task #3456: create tags for common and libclient for metacatClosedRobert Waltz

Task #3457: Creating a metacat with tagged common and libclientClosedBen Leinfelder

Task #3458: Tag all 1.1 productsClosedRobert Waltz

Task #3459: Reinstall the 1.0.4 release on stageClosedChris Jones

Task #3460: Upgrade on Stage of 1.04 to 1.1ClosedRobert Waltz

Task #3461: Rollout 1.1 to productionClosedRobert Waltz

Task #3517: Modify dataone-cn-index prerm PRIOR to updgradeClosedRobert Waltz

Task #3482: Increase available physical volumes on cn-stage-ucsb-1.test.dataone.orgClosedNick Outin

Task #3483: Increase available physical volumes on cn-stage-orc-1.test.dataone.orgClosedChris Brumgard

Task #3485: Increase available physical volumes on cn-ucsb-1.dataone.orgClosedNick Outin

Task #3486: Increase available physical volumes on cn-orc-1.dataone.orgClosedChris Brumgard

Task #3489: Upgrade Java 6 debian package to latest release using oab-java6ClosedRobert Waltz

History

#1 Updated by Robert Waltz almost 12 years ago

  • Parent task deleted (#3434)

#2 Updated by Robert Waltz almost 12 years ago

  • Tracker changed from Task to Story
  • Due date set to 2013-01-07
  • translation missing: en.field_remaining_hours set to 0.0

#3 Updated by Robert Waltz almost 12 years ago

  • Status changed from New to Closed

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 14.8 MB)