Project

General

Profile

Task #2597

MNDeployment #2564: ORNL DAAC

Dates in system metadata from DAAC and Clearinghouse MNs are not accurate

Added by Dave Vieglais over 12 years ago. Updated almost 12 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Jim Green
Target version:
Start date:
2013-02-18
Due date:
% Done:

100%

Estimated time:
0.00 h
Story Points:
Sprint:

Description

The fields dateSystemMetadataModified and dateUploaded in the system metadata for content on the DAAC and Clearinghouse MNs are not correct.

These fields should be set to the time that the system metadata was last modified and the time that the content was uploaded to the member node respectively.

In the case of the clearinghouse, dates of around 2011-10-04 are present which can not be correct.

Similarly for the DAAC, the dates are from 2010.

History

#1 Updated by Dave Vieglais almost 12 years ago

  • translation missing: en.field_remaining_hours set to 0.0
  • Start date deleted (2012-04-11)
  • Category changed from 299 to mn.Mercury

#2 Updated by John Cobb almost 12 years ago

  • Target version set to Operational

#3 Updated by John Cobb almost 12 years ago

  • Category deleted (mn.Mercury)
  • Project changed from Infrastructure to Member Nodes
  • Parent task set to #2564

#4 Updated by Rob Nahf almost 12 years ago

  • Status changed from New to Closed
  • Estimated time set to 0.00
  • % Done changed from 0 to 100
  • Start date set to 2013-02-18

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 14.8 MB)