Project

General

Profile

CCI.Prototype.Evaluation

2010-10-08

100%

10 issues   (10 closed — 0 open)

Test and evaluation of the prototype infrastructure. Includes API conformance, data flow, scalability, failure recovery

Issues by
Task

9/9

Bug

1/1

Add picture from clipboard (Maximum size: 14.8 MB)