2015-01-16
- 18:12 MNDeployment #5349 (Closed): KUBI: Developing
- 18:12 MNDeployment #5354 (Closed): KUBI: Testing
- 18:11 MNDeployment #5342 (Closed): KUBI: Planning
- 18:11 MNDeployment #5339 (Closed): KUBI: Initial Preparation
- 18:11 MNDeployment #5225 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-30_08:49:05
- 18:11 MNDeployment #4998 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_20:24:02
- 18:11 MNDeployment #5146 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-30_08:41:28
- 18:11 MNDeployment #4879 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_20:20:47
- 18:11 MNDeployment #4839 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_20:18:46
- 18:11 MNDeployment #4802 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_20:10:42
- 18:11 MNDeployment #4801 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_20:10:18
- 18:11 MNDeployment #4796 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_13:09:50
- 18:11 MNDeployment #4797 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_13:10:42
- 18:11 MNDeployment #4798 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_13:11:43
- 18:11 MNDeployment #4795 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_13:06:48
- 18:11 MNDeployment #4794 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_12:50:45
- 18:11 MNDeployment #4793 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_12:47:31
- 18:11 MNDeployment #4792 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_12:47:05
- 18:11 MNDeployment #4791 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_12:45:22
- 18:11 MNDeployment #4787 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_23:11:17
- 18:11 MNDeployment #4790 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-15_12:42:20
- 18:11 MNDeployment #4786 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_23:11:06
- 18:11 MNDeployment #4785 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_23:11:02
- 18:11 MNDeployment #4784 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_23:09:45
- 18:11 MNDeployment #4783 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_23:06:08
- 18:11 MNDeployment #4782 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_23:04:46
- 18:11 MNDeployment #4779 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_23:04:34
- 18:11 MNDeployment #4775 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_23:03:41
- 18:11 MNDeployment #4774 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_22:32:51
- 18:11 MNDeployment #4773 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_22:30:51
- 18:11 MNDeployment #4771 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_22:16:25
- 18:11 MNDeployment #4772 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_22:25:16
- 18:11 MNDeployment #4743 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_22:08:36
- 18:11 MNDeployment #4745 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_22:09:44
- 18:11 MNDeployment #4731 (Closed): MNDeployment: urn:node:KUBI 2014-04-14_21:48:49
- 18:11 MNDeployment #4741 (Closed): KUBI: MNDeployment: urn:node:KUBI 2014-04-14_22:07:22
- 18:11 MNDeployment #4417 (Closed): MNDeployment: urn:node:KUBI 2014-03-13_21:15:33
- 18:11 MNDeployment #4418 (Closed): MNDeployment: urn:node:KUBI 2014-03-14_09:50:37
- 18:11 MNDeployment #4419 (Closed): MNDeployment: urn:node:KUBI 2014-03-14_09:51:47
- 18:11 MNDeployment #4416 (Closed): MNDeployment: urn:node:KUBI 2014-03-13_21:14:40
- 18:11 MNDeployment #4413 (Closed): MNDeployment: urn:node:KUBI 2014-03-13_19:54:24
- 18:11 MNDeployment #4415 (Closed): MNDeployment: urn:node:KUBI 2014-03-13_21:13:22
- 18:11 MNDeployment #4414 (Closed): MNDeployment: urn:node:KUBI 2014-03-13_20:18:14
- 18:07 Task #5101 (Closed): KUBI PROD: Verify that the Science Metadata is correctly processed by CNs
- 18:07 Task #5100 (Closed): KUBI PROD: Verify Science Metadata is returned with the correct HTTP Content...
- 18:07 Task #5099 (Closed): KUBI PROD: Verify Science Metadata content
- 18:07 Task #5098 (Closed): KUBI PROD: Verify Science Metadata
- 18:07 Task #5097 (Closed): KUBI PROD: Verify that the Science Data is returned with the correct HTTP Co...
- 18:07 Task #5096 (Closed): KUBI PROD: Verify Science Data content
- 18:07 Task #5095 (Closed): KUBI PROD: Verify Science Data
- 18:07 Task #5094 (Closed): KUBI PROD: Content Review
- 18:07 Task #5093 (Closed): KUBI PROD: Set up synchronization of the MN
- 18:07 Task #5092 (Closed): KUBI PROD: Synchronization
- 18:07 Task #5091 (Closed): KUBI PROD: Set the node status to approved (start synchronization)
- 18:07 Task #5090 (Closed): KUBI PROD: Set up Node document
- 18:07 Task #5089 (Closed): KUBI PROD: Register MN
- 18:07 Task #5088 (Closed): KUBI PROD: Verify successful installation of server side certificate
- 18:07 Task #5087 (Closed): KUBI PROD: Verify successful installation of client side certificate
- 18:07 Task #5086 (Closed): KUBI PROD: Generate client certificate for urn:node:KUBI
- 18:07 Task #5085 (Closed): KUBI PROD: SSL Certificates
- 18:07 Task #5084 (Closed): KUBI PROD: Register new Science Metadata formats
- 18:07 Task #5083 (Closed): KUBI PROD: Registration in environment
- 18:07 Task #5082 (Closed): KUBI STAGE: Formal announcement
- 18:07 Task #5081 (Closed): KUBI STAGE: Create news item
- 18:07 Task #5080 (Closed): KUBI STAGE: Create legal documents
- 18:07 Task #5079 (Closed): KUBI STAGE: Verify content available for Current MNs web page
- 18:07 Task #5078 (Closed): KUBI STAGE: Mutual acceptance
- 18:06 Task #5077 (Closed): KUBI STAGE: Transition to production
- 18:06 Task #5076 (Closed): KUBI STAGE: Replication testing (if Tier 4)
- 18:06 Task #5075 (Closed): KUBI STAGE: Log record access
- 18:06 Task #5074 (Closed): KUBI STAGE: Science Metadata access
- 18:06 Task #5073 (Closed): KUBI STAGE: Science Data access
- 18:06 Task #5072 (Closed): KUBI STAGE: Authentication and Authorization
- 18:06 Task #5071 (Closed): KUBI STAGE: Verify that Resource Maps are correctly processed by CNs.
- 18:06 Task #5070 (Closed): KUBI STAGE: Verify Resource Map is returned with the correct HTTP Content-Type
- 18:06 Task #5069 (Closed): KUBI STAGE: Verify Resource Map content
- 18:06 Task #5068 (Closed): KUBI STAGE: Verify Resource Maps
- 18:06 Task #5067 (Closed): KUBI STAGE: Verify that the Science Metadata is correctly processed by CNs
- 18:06 Task #5066 (Closed): KUBI STAGE: Verify Science Metadata is returned with the correct HTTP Conten...
- 18:06 Task #5065 (Closed): KUBI STAGE: Verify Science Metadata content
- 18:06 Task #5064 (Closed): KUBI STAGE: Verify Science Metadata
- 18:06 Task #5063 (Closed): KUBI STAGE: Verify that the Science Data is returned with the correct HTTP C...
- 18:06 Task #5062 (Closed): KUBI STAGE: Verify Science Data content
- 18:06 Task #5061 (Closed): KUBI STAGE: Verify Science Data
- 18:06 Task #5060 (Closed): KUBI STAGE: Content Review
- 18:06 Task #5059 (Closed): KUBI STAGE: Set up synchronization of the MN
- 18:06 Task #5058 (Closed): KUBI STAGE: Synchronization
- 18:06 Task #5057 (Closed): KUBI STAGE: Set the node status to approved (start synchronization)
- 18:06 Task #5056 (Closed): KUBI STAGE: Set up Node document
- 18:06 Task #5055 (Closed): KUBI STAGE: Register MN
- 18:06 Task #5054 (Closed): KUBI STAGE: Verify successful installation of server side certificate
- 18:06 Task #5053 (Closed): KUBI STAGE: Verify successful installation of client side certificate
- 18:06 Task #5052 (Closed): KUBI STAGE: Generate client certificate for urn:node:KUBI
- 18:06 Task #5051 (Closed): KUBI STAGE: SSL Certificates
- 18:06 Task #5050 (Closed): KUBI STAGE: Register new Science Metadata formats
- 18:05 Task #5049 (Closed): KUBI STAGE: Registration in environment
- 18:05 Task #5048 (Closed): KUBI DEV: Formal announcement
- 18:05 Task #5047 (Closed): KUBI DEV: Create news item
- 18:05 Task #5046 (Closed): KUBI DEV: Create legal documents
- 18:05 Task #5045 (Closed): KUBI DEV: Verify content available for Current MNs web page
- 18:05 Task #5044 (Closed): KUBI DEV: Mutual acceptance
- 18:05 Task #5043 (Closed): KUBI DEV: Transition to production
- 18:05 Task #5042 (Closed): KUBI DEV: Replication testing (if Tier 4)
- 18:05 Task #5041 (Closed): KUBI DEV: Log record access
- 18:05 Task #5040 (Closed): KUBI DEV: Science Metadata access
- 18:05 Task #5039 (Closed): KUBI DEV: Science Data access
- 18:05 Task #5038 (Closed): KUBI DEV: Authentication and Authorization
- 18:05 Task #5037 (Closed): KUBI DEV: Verify that Resource Maps are correctly processed by CNs.
- 18:05 Task #5036 (Closed): KUBI DEV: Verify Resource Map is returned with the correct HTTP Content-Type
- 18:05 Task #5035 (Closed): KUBI DEV: Verify Resource Map content
- 18:05 Task #5034 (Closed): KUBI DEV: Verify Resource Maps
- 18:05 Task #5033 (Closed): KUBI DEV: Verify that the Science Metadata is correctly processed by CNs
- 18:05 Task #5032 (Closed): KUBI DEV: Verify Science Metadata is returned with the correct HTTP Content-...
- 18:05 Task #5031 (Closed): KUBI DEV: Verify Science Metadata content
- 18:05 Task #5030 (Closed): KUBI DEV: Verify Science Metadata
- 18:05 Task #5029 (Closed): KUBI DEV: Verify that the Science Data is returned with the correct HTTP Con...
- 18:05 Task #5028 (Closed): KUBI DEV: Verify Science Data content
- 18:05 Task #5027 (Closed): KUBI DEV: Verify Science Data
- 18:05 Task #5026 (Closed): KUBI DEV: Content Review
- 18:05 Task #5025 (Closed): KUBI DEV: Set up synchronization of the MN
- 18:05 Task #5024 (Closed): KUBI DEV: Synchronization
- 18:05 Task #5023 (Closed): KUBI DEV: Set the node status to approved (start synchronization)
- 18:05 Task #5022 (Closed): KUBI DEV: Set up Node document
- 18:05 Task #5021 (Closed): KUBI DEV: Register MN
- 18:04 Task #5020 (Closed): KUBI DEV: Verify successful installation of server side certificate
- 18:04 Task #5019 (Closed): KUBI DEV: Verify successful installation of client side certificate
- 18:04 Task #5018 (Closed): KUBI DEV: Generate client certificate for urn:node:KUBI
- 18:04 Task #5017 (Closed): KUBI DEV: SSL Certificates
- 18:04 Task #5016 (Closed): KUBI DEV: Register new Science Metadata formats
- 18:04 Task #5015 (Closed): KUBI DEV: Registration in environment
- 18:04 Task #5014 (Closed): KUBI: Testing
- 18:04 Task #5013 (Closed): KUBI: Verify that MN passes the Replication Tester
- 18:04 Task #5012 (Closed): KUBI: Verify that MN passes the Web Tester
- 18:04 Task #5011 (Closed): KUBI: Local Testing
- 18:04 Task #5010 (Closed): KUBI: Design, code and component test a new MN implementation
- 18:04 Task #5009 (Closed): KUBI: Developing
- 18:04 Task #5008 (Closed): KUBI: Plan the implementation
- 18:04 Task #5007 (Closed): KUBI: Scope the implementation
- 18:04 Task #5006 (Closed): KUBI: Create MN description document
- 18:04 Task #5005 (Closed): KUBI: Create DataONE identities
- 18:04 Task #5004 (Closed): KUBI: Integrate MN representatives with community
- 18:04 Task #5003 (Closed): KUBI: Join DataONE
- 18:04 Task #5002 (Closed): KUBI: Planning
- 18:04 Task #5001 (Closed): KUBI: Determine feasibility
- 18:04 Task #5000 (Closed): KUBI: Establish contact with potential MN organization
- 18:04 Task #4999 (Closed): KUBI: Initial Preparation
- 18:04 Task #4997 (Closed): KUBI PROD: Formal announcement
- 18:04 Task #4996 (Closed): KUBI PROD: Create news item
- 18:04 Task #4995 (Closed): KUBI PROD: Create legal documents
- 18:04 Task #4994 (Closed): KUBI PROD: Verify content available for Current MNs web page
- 18:04 Task #4993 (Closed): KUBI PROD: Mutual acceptance
- 18:04 Task #4992 (Closed): KUBI PROD: Transition to production
- 18:04 Task #4991 (Closed): KUBI PROD: Replication testing (if Tier 4)
- 18:04 Task #4990 (Closed): KUBI PROD: Log record access
- 18:04 Task #4989 (Closed): KUBI PROD: Science Metadata access
- 18:04 Task #4988 (Closed): KUBI PROD: Science Data access
- 18:04 Task #4987 (Closed): KUBI PROD: Authentication and Authorization
- 18:04 Task #4986 (Closed): KUBI PROD: Verify that Resource Maps are correctly processed by CNs.
- 18:04 Task #4985 (Closed): KUBI PROD: Verify Resource Map is returned with the correct HTTP Content-Type
- 18:03 Task #4984 (Closed): KUBI PROD: Verify Resource Map content
- 18:03 Task #4983 (Closed): KUBI PROD: Verify Resource Maps
- 18:03 Task #4982 (Closed): KUBI PROD: Verify that the Science Metadata is correctly processed by CNs
- 18:03 Task #4981 (Closed): KUBI PROD: Verify Science Metadata is returned with the correct HTTP Content...
- 18:03 Task #4980 (Closed): KUBI PROD: Verify Science Metadata content
- 18:03 Task #4979 (Closed): KUBI PROD: Verify Science Metadata
- 18:03 Task #4978 (Closed): KUBI PROD: Verify that the Science Data is returned with the correct HTTP Co...
- 18:03 Task #4977 (Closed): KUBI PROD: Verify Science Data content
- 18:03 Task #4976 (Closed): KUBI PROD: Verify Science Data
- 18:03 Task #4975 (Closed): KUBI PROD: Content Review
- 18:03 Task #4974 (Closed): KUBI PROD: Set up synchronization of the MN
- 18:03 Task #4973 (Closed): KUBI PROD: Synchronization
- 18:03 Task #4972 (Closed): KUBI PROD: Set the node status to approved (start synchronization)
- 18:03 Task #4971 (Closed): KUBI PROD: Set up Node document
- 18:03 Task #4970 (Closed): KUBI PROD: Register MN
- 18:03 Task #4969 (Closed): KUBI PROD: Verify successful installation of server side certificate
- 18:03 Task #4968 (Closed): KUBI PROD: Verify successful installation of client side certificate
- 18:03 Task #4967 (Closed): KUBI PROD: Generate client certificate for urn:node:KUBI
- 18:03 Task #4966 (Closed): KUBI PROD: SSL Certificates
- 18:03 Task #4965 (Closed): KUBI PROD: Register new Science Metadata formats
- 18:03 Task #4964 (Closed): KUBI PROD: Registration in environment
- 18:03 Task #4963 (Closed): KUBI STAGE: Formal announcement
- 18:03 Task #4962 (Closed): KUBI STAGE: Create news item
- 18:03 Task #4961 (Closed): KUBI STAGE: Create legal documents
- 18:03 Task #4960 (Closed): KUBI STAGE: Verify content available for Current MNs web page
- 18:03 Task #4959 (Closed): KUBI STAGE: Mutual acceptance
- 18:03 Task #4958 (Closed): KUBI STAGE: Transition to production
- 18:03 Task #4957 (Closed): KUBI STAGE: Replication testing (if Tier 4)
- 18:03 Task #4956 (Closed): KUBI STAGE: Log record access
- 18:03 Task #4955 (Closed): KUBI STAGE: Science Metadata access
- 18:02 Task #4954 (Closed): KUBI STAGE: Science Data access
- 18:02 Task #4953 (Closed): KUBI STAGE: Authentication and Authorization
- 18:02 Task #4952 (Closed): KUBI STAGE: Verify that Resource Maps are correctly processed by CNs.
- 18:02 Task #4951 (Closed): KUBI STAGE: Verify Resource Map is returned with the correct HTTP Content-Type
- 18:02 Task #4950 (Closed): KUBI STAGE: Verify Resource Map content
- 18:02 Task #4949 (Closed): KUBI STAGE: Verify Resource Maps
- 18:02 Task #4948 (Closed): KUBI STAGE: Verify that the Science Metadata is correctly processed by CNs
- 18:02 Task #4947 (Closed): KUBI STAGE: Verify Science Metadata is returned with the correct HTTP Conten...
- 18:02 Task #4946 (Closed): KUBI STAGE: Verify Science Metadata content
- 18:02 Task #4945 (Closed): KUBI STAGE: Verify Science Metadata
- 18:02 Task #4944 (Closed): KUBI STAGE: Verify that the Science Data is returned with the correct HTTP C...
- 18:02 Task #4943 (Closed): KUBI STAGE: Verify Science Data content
- 18:02 Task #4942 (Closed): KUBI STAGE: Verify Science Data
- 18:02 Task #4941 (Closed): KUBI STAGE: Content Review
- 18:02 Task #4940 (Closed): KUBI STAGE: Set up synchronization of the MN
- 18:02 Task #4939 (Closed): KUBI STAGE: Synchronization
- 18:02 Task #4938 (Closed): KUBI STAGE: Set the node status to approved (start synchronization)
- 18:02 Task #4937 (Closed): KUBI STAGE: Set up Node document
- 18:02 Task #4936 (Closed): KUBI STAGE: Register MN
- 18:02 Task #4935 (Closed): KUBI STAGE: Verify successful installation of server side certificate
- 18:02 Task #4934 (Closed): KUBI STAGE: Verify successful installation of client side certificate
- 18:02 Task #4933 (Closed): KUBI STAGE: Generate client certificate for urn:node:KUBI
- 18:02 Task #4932 (Closed): KUBI STAGE: SSL Certificates
- 18:02 Task #4931 (Closed): KUBI STAGE: Register new Science Metadata formats
- 18:02 Task #4929 (Closed): KUBI DEV: Formal announcement
- 18:02 Task #4930 (Closed): KUBI STAGE: Registration in environment
- 18:02 Task #4928 (Closed): KUBI DEV: Create news item
- 18:02 Task #4927 (Closed): KUBI DEV: Create legal documents
- 18:02 Task #4926 (Closed): KUBI DEV: Verify content available for Current MNs web page
- 18:02 Task #4925 (Closed): KUBI DEV: Mutual acceptance
- 18:02 Task #4924 (Closed): KUBI DEV: Transition to production
- 18:01 Task #4923 (Closed): KUBI DEV: Replication testing (if Tier 4)
- 18:01 Task #4922 (Closed): KUBI DEV: Log record access
- 18:01 Task #4921 (Closed): KUBI DEV: Science Metadata access
- 18:01 Task #4920 (Closed): KUBI DEV: Science Data access
- 18:01 Task #4919 (Closed): KUBI DEV: Authentication and Authorization
- 18:01 Task #4918 (Closed): KUBI DEV: Verify that Resource Maps are correctly processed by CNs.
- 18:01 Task #4917 (Closed): KUBI DEV: Verify Resource Map is returned with the correct HTTP Content-Type
- 18:01 Task #4916 (Closed): KUBI DEV: Verify Resource Map content
- 18:01 Task #4915 (Closed): KUBI DEV: Verify Resource Maps
- 18:01 Task #4914 (Closed): KUBI DEV: Verify that the Science Metadata is correctly processed by CNs
- 18:01 Task #4913 (Closed): KUBI DEV: Verify Science Metadata is returned with the correct HTTP Content-...
- 18:01 Task #4912 (Closed): KUBI DEV: Verify Science Metadata content
- 18:01 Task #4911 (Closed): KUBI DEV: Verify Science Metadata
- 18:01 Task #4910 (Closed): KUBI DEV: Verify that the Science Data is returned with the correct HTTP Con...
- 18:01 Task #4909 (Closed): KUBI DEV: Verify Science Data content
- 18:01 Task #4908 (Closed): KUBI DEV: Verify Science Data
- 18:01 Task #4907 (Closed): KUBI DEV: Content Review
- 18:01 Task #4906 (Closed): KUBI DEV: Set up synchronization of the MN
- 18:01 Task #4905 (Closed): KUBI DEV: Synchronization
- 18:01 Task #4904 (Closed): KUBI DEV: Set the node status to approved (start synchronization)
- 18:01 Task #4903 (Closed): KUBI DEV: Set up Node document
- 18:01 Task #4902 (Closed): KUBI DEV: Register MN
- 18:01 Task #4901 (Closed): KUBI DEV: Verify successful installation of server side certificate
- 18:01 Task #4900 (Closed): KUBI DEV: Verify successful installation of client side certificate
- 18:01 Task #4898 (Closed): KUBI DEV: SSL Certificates
- 18:01 Task #4899 (Closed): KUBI DEV: Generate client certificate for urn:node:KUBI
- 18:01 Task #4897 (Closed): KUBI DEV: Register new Science Metadata formats
- 18:01 Task #4896 (Closed): KUBI DEV: Registration in environment
- 18:01 Task #4895 (Closed): KUBI: Testing
- 18:01 Task #4894 (Closed): KUBI: Verify that MN passes the Replication Tester
- 18:01 Task #4893 (Closed): KUBI: Verify that MN passes the Web Tester
- 18:01 Task #4892 (Closed): KUBI: Local Testing
- 18:01 Task #4891 (Closed): KUBI: Design, code and component test a new MN implementation
- 18:01 Task #4890 (Closed): KUBI: Developing
- 18:00 Task #4889 (Closed): KUBI: Plan the implementation
- 18:00 Task #4888 (Closed): KUBI: Scope the implementation
- 18:00 Task #4887 (Closed): KUBI: Create MN description document
- 18:00 Task #4886 (Closed): KUBI: Create DataONE identities
- 18:00 Task #4885 (Closed): KUBI: Integrate MN representatives with community
- 18:00 Task #4884 (Closed): KUBI: Join DataONE
- 18:00 Task #4883 (Closed): KUBI: Planning
- 18:00 Task #4882 (Closed): KUBI: Determine feasibility
- 18:00 Task #4881 (Closed): KUBI: Establish contact with potential MN organization
- 18:00 Task #4880 (Closed): KUBI: Initial Preparation
- 18:00 Task #4878 (Closed): KUBI DEV: Verify that Resource Maps are correctly processed by CNs.
- 18:00 Task #4877 (Closed): KUBI DEV: Verify Resource Map is returned with the correct HTTP Content-Type
- 18:00 Task #4876 (Closed): KUBI DEV: Verify Resource Map content
- 18:00 Task #4875 (Closed): KUBI DEV: Verify Resource Maps
- 18:00 Task #4874 (Closed): KUBI DEV: Verify that the Science Metadata is correctly processed by CNs
- 18:00 Task #4873 (Closed): KUBI DEV: Verify Science Metadata is returned with the correct HTTP Content-...
- 18:00 Task #4872 (Closed): KUBI DEV: Verify Science Metadata content
- 18:00 Task #4871 (Closed): KUBI DEV: Verify Science Metadata
- 18:00 Task #4870 (Closed): KUBI DEV: Verify that the Science Data is returned with the correct HTTP Con...
- 18:00 Task #4869 (Closed): KUBI DEV: Verify Science Data content
- 18:00 Task #4868 (Closed): KUBI DEV: Verify Science Data
- 18:00 Task #4867 (Closed): KUBI DEV: Content Review
- 18:00 Task #4866 (Closed): KUBI DEV: Set up synchronization of the MN
- 18:00 Task #4865 (Closed): KUBI DEV: Synchronization
- 18:00 Task #4864 (Closed): KUBI DEV: Set the node status to approved (start synchronization)
- 18:00 Task #4863 (Closed): KUBI DEV: Set up Node document
- 18:00 Task #4862 (Closed): KUBI DEV: Register MN
- 18:00 Task #4861 (Closed): KUBI DEV: Verify successful installation of server side certificate
- 18:00 Task #4860 (Closed): KUBI DEV: Verify successful installation of client side certificate
- 18:00 Task #4859 (Closed): KUBI DEV: Generate client certificate for urn:node:KUBI
- 18:00 Task #4858 (Closed): KUBI DEV: SSL Certificates
- 18:00 Task #4857 (Closed): KUBI DEV: Register new Science Metadata formats
- 18:00 Task #4856 (Closed): KUBI DEV: Registration in environment
- 18:00 Task #4855 (Closed): KUBI: Testing
- 18:00 Task #4854 (Closed): KUBI: Verify that MN passes the Replication Tester
- 18:00 Task #4853 (Closed): KUBI: Verify that MN passes the Web Tester
- 18:00 Task #4852 (Closed): KUBI: Local Testing
- 18:00 Task #4851 (Closed): KUBI: Design, code and component test a new MN implementation
- 18:00 Task #4850 (Closed): KUBI: Developing
- 17:59 Task #4849 (Closed): KUBI: Plan the implementation
- 17:59 Task #4848 (Closed): KUBI: Scope the implementation
- 17:59 Task #4847 (Closed): KUBI: Create MN description document
- 17:59 Task #4846 (Closed): KUBI: Create DataONE identities
- 17:59 Task #4845 (Closed): KUBI: Integrate MN representatives with community
- 17:59 Task #4844 (Closed): KUBI: Join DataONE
- 17:59 Task #4843 (Closed): KUBI: Planning
- 17:59 Task #4842 (Closed): KUBI: Determine feasibility
- 17:59 Task #4841 (Closed): KUBI: Establish contact with potential MN organization
- 17:59 Task #4840 (Closed): KUBI: Initial Preparation
- 17:59 Task #4838 (Closed): KUBI DEV: Verify Resource Maps
- 17:59 Task #4837 (Closed): KUBI DEV: Verify that the Science Metadata is correctly processed by CNs
- 17:59 Task #4836 (Closed): KUBI DEV: Verify Science Metadata is returned with the correct HTTP Content-...
- 17:59 Task #4835 (Closed): KUBI DEV: Verify Science Metadata content
- 17:59 Task #4834 (Closed): KUBI DEV: Verify Science Metadata
- 17:59 Task #4833 (Closed): KUBI DEV: Verify that the Science Data is returned with the correct HTTP Con...
- 17:59 Task #4832 (Closed): KUBI DEV: Verify Science Data content
- 17:59 Task #4831 (Closed): KUBI DEV: Verify Science Data
- 17:59 Task #4830 (Closed): KUBI DEV: Content Review
- 17:59 Task #4829 (Closed): KUBI DEV: Set up synchronization of the MN
- 17:59 Task #4828 (Closed): KUBI DEV: Synchronization
- 17:59 Task #4827 (Closed): KUBI DEV: Set the node status to approved (start synchronization)
- 17:59 Task #4825 (Closed): KUBI DEV: Register MN
- 17:59 Task #4826 (Closed): KUBI DEV: Set up Node document
- 17:59 Task #4824 (Closed): KUBI DEV: Verify successful installation of server side certificate
- 17:59 Task #4823 (Closed): KUBI DEV: Verify successful installation of client side certificate
- 17:59 Task #4822 (Closed): KUBI DEV: Generate client certificate for urn:node:KUBI
- 17:59 Task #4821 (Closed): KUBI DEV: SSL Certificates
- 17:59 Task #4820 (Closed): KUBI DEV: Register new Science Metadata formats
- 17:59 Task #4819 (Closed): KUBI DEV: Registration in environment
- 17:59 Task #4818 (Closed): KUBI: Testing
- 17:59 Task #4817 (Closed): KUBI: Verify that MN passes the Replication Tester
- 17:59 Task #4816 (Closed): KUBI: Verify that MN passes the Web Tester
- 17:59 Task #4815 (Closed): KUBI: Local Testing
- 17:59 Task #4814 (Closed): KUBI: Design, code and component test a new MN implementation
- 17:59 Task #4813 (Closed): KUBI: Developing
- 17:59 Task #4812 (Closed): KUBI: Plan the implementation
- 17:59 Task #4811 (Closed): KUBI: Scope the implementation
- 17:59 Task #4810 (Closed): KUBI: Create MN description document
- 17:59 Task #4809 (Closed): KUBI: Create DataONE identities
- 17:59 Task #4808 (Closed): KUBI: Integrate MN representatives with community
- 17:59 Task #4807 (Closed): KUBI: Join DataONE
- 17:59 Task #4806 (Closed): KUBI: Planning
- 17:59 Task #4805 (Closed): KUBI: Determine feasibility
- 17:58 Task #4804 (Closed): KUBI: Establish contact with potential MN organization
- 17:58 Task #4803 (Closed): KUBI: Initial Preparation
- 17:58 Task #4781 (Closed): KUBI: Establish contact with potential MN organization
- 17:58 Task #4780 (Closed): KUBI: Initial Preparation
- 17:58 Task #4778 (Closed): KUBI: Determine feasibility
- 17:58 Task #4777 (Closed): KUBI: Establish contact with potential MN organization
- 17:58 Task #4776 (Closed): KUBI: Initial Preparation
- 17:58 Task #4770 (Closed): KUBI PROD: t2
- 17:58 Task #4769 (Closed): KUBI PROD: t1
- 17:58 Task #4768 (Closed): KUBI PROD: Registration in environment
- 17:58 Task #4767 (Closed): KUBI STAGE: t2
- 17:58 Task #4766 (Closed): KUBI STAGE: t1
- 17:58 Task #4765 (Closed): KUBI STAGE: Registration in environment
- 17:58 Task #4764 (Closed): KUBI DEV: t2
- 17:58 Task #4763 (Closed): KUBI DEV: t1
- 17:58 Task #4762 (Closed): KUBI DEV: Registration in environment
- 17:58 Task #4761 (Closed): KUBI: Testing
- 17:58 Task #4760 (Closed): KUBI: Verify that MN passes the Replication Tester
- 17:58 Task #4759 (Closed): KUBI: Verify that MN passes the Web Tester
- 17:58 Task #4758 (Closed): KUBI: Local Testing
- 17:58 Task #4756 (Closed): KUBI: Developing
- 17:58 Task #4757 (Closed): KUBI: Develop Member Node software
- 17:58 Task #4755 (Closed): KUBI: Plan the implementation
- 17:58 Task #4753 (Closed): KUBI: Create MN description document
- 17:58 Task #4754 (Closed): KUBI: Scope the implementation
- 17:58 Task #4752 (Closed): KUBI: Create DataONE identities
- 17:58 Task #4751 (Closed): KUBI: Integrate MN representatives with community
- 17:58 Task #4750 (Closed): KUBI: Join DataONE
- 17:58 Task #4749 (Closed): KUBI: Planning
- 17:58 Task #4748 (Closed): KUBI: Determine feasibility
- 17:58 Task #4747 (Closed): KUBI: Establish contact with potential MN organization
- 17:58 Task #4746 (Closed): KUBI: Initial Preparation
- 17:58 Task #4744 (Closed): KUBI: Initial Preparation
- 17:58 Task #4742 (Closed): KUBI: Initial Preparation
- 17:58 Task #4740 (Closed): Scope the implementation
- 17:58 Task #4739 (Closed): Create MN description document
- 17:58 Task #4738 (Closed): Create DataONE identities
- 17:58 Task #4737 (Closed): Integrate MN representatives with community
- 17:58 Task #4736 (Closed): Join DataONE
- 17:58 Task #4735 (Closed): Planning
- 17:58 Task #4734 (Closed): Determine feasibility
- 17:58 Task #4733 (Closed): Establish contact with potential MN organization
- 17:58 Task #4732 (Closed): Initial Preparation
- 17:58 Task #4458 (Closed): Formal announcement
- 17:58 Task #4457 (Closed): Create news item
- 17:58 Task #4456 (Closed): Create legal documents
- 17:58 Task #4455 (Closed): Final steps to go live
- 17:58 Task #4454 (Closed): Production verifications
- 17:58 Task #4453 (Closed): Mutual acceptance
- 17:58 Task #4452 (Closed): Update "Current MNs" webpage
- 17:58 Task #4451 (Closed): Transition to production.
- 17:58 Task #4450 (Closed): Resolve any synchronization related issues
- 17:58 Task #4449 (Closed): Review synchronization results
- 17:58 Task #4448 (Closed): Set up synchronization of the MN
- 17:58 Task #4447 (Closed): Synchronization
- 17:57 Task #4446 (Closed): Register new Science Metadata formats
- 17:57 Task #4445 (Closed): Synchronization
- 17:57 Task #4444 (Closed): Log Record access
- 17:57 Task #4443 (Closed): Science Metadata access
- 17:57 Task #4442 (Closed): Science Data access
- 17:57 Task #4441 (Closed): Authentication and Authorization
- 17:57 Task #4440 (Closed): Create Resource Maps for the data and metadata
- 17:57 Task #4439 (Closed): Verify Science Metadata
- 17:57 Task #4438 (Closed): Science Metadata is available in Solr index
- 17:57 Task #4437 (Closed): Verify that the Science Metadata is returned with the correct HTTP Content-Type
- 17:57 Task #4436 (Closed): Science Metadata
- 17:57 Task #4435 (Closed): Verify that the Science Data is returned with the correct HTTP Content-Type
- 17:57 Task #4434 (Closed): Science Data
- 17:57 Task #4433 (Closed): Content Review
- 17:57 Task #4431 (Closed): Verify successful installation of server side certificate
- 17:57 Task #4432 (Closed): Set up Node document
- 17:57 Task #4430 (Closed): Verify successful installation of client side certificate
- 17:57 Task #4429 (Closed): Generate urn:node:KUBI client certificate for development.
- 17:57 Task #4428 (Closed): SSL Certificates for Development
- 17:57 Task #4427 (Closed): SSL Certificates
- 17:57 Task #4426 (Closed): Design, code and test a new MN implementation.
- 17:57 Task #4425 (Closed): Scope and plan implementation
- 17:57 Task #4424 (Closed): Create MN description document
- 17:57 Task #4423 (Closed): Create DataONE identity
- 17:57 Task #4422 (Closed): Integrate MN representatives with community
- 17:57 Task #4421 (Closed): Establish contact with potential MN organization
- 17:57 Task #4420 (Closed): Initial preparation
- 17:57 Task #4411 (Closed): Formal announcement
- 17:57 Task #4412 (Closed): MNDeployment: urn:node:KUBI 2014-03-13_19:44:58
- 17:57 Task #4410 (Closed): Create news item
- 17:57 Task #4409 (Closed): Create legal documents
- 17:57 Task #4408 (Closed): Final steps to go live
- 17:57 Task #4407 (Closed): Production verifications
- 17:57 Task #4406 (Closed): Mutual acceptance
- 17:57 Task #4405 (Closed): Update "Current MNs" webpage
- 17:57 Task #4404 (Closed): Transition to production.
- 17:57 Task #4403 (Closed): Resolve any synchronization related issues
- 17:57 Task #4402 (Closed): Review synchronization results
- 17:57 Task #4400 (Closed): Synchronization
- 17:57 Task #4401 (Closed): Set up synchronization of the MN
- 17:57 Task #4399 (Closed): Register new Science Metadata formats
- 17:57 Task #4398 (Closed): Synchronization
- 17:57 Task #4397 (Closed): Log Record access
- 17:57 Task #4396 (Closed): Science Metadata access
- 17:57 Task #4395 (Closed): Science Data access
- 17:57 Task #4394 (Closed): Authentication and Authorization
- 17:57 Task #4393 (Closed): Create Resource Maps for the data and metadata
- 17:57 Task #4392 (Closed): Verify Science Metadata
- 17:57 Task #4391 (Closed): Science Metadata is available in Solr index
- 17:57 Task #4390 (Closed): Verify that the Science Metadata is returned with the correct HTTP Content-Type
- 17:57 Task #4389 (Closed): Science Metadata
- 17:57 Task #4388 (Closed): Verify that the Science Data is returned with the correct HTTP Content-Type
- 17:57 Task #4386 (Closed): Content Review
- 17:57 Task #4387 (Closed): Science Data
- 17:57 Task #4385 (Closed): Set up Node document
- 17:57 Task #4384 (Closed): Verify successful installation of server side certificate
- 17:57 Task #4383 (Closed): Verify successful installation of client side certificate
- 17:57 Task #4382 (Closed): Generate urn:node:KUBI client certificate for development.
- 17:56 Task #4381 (Closed): SSL Certificates for Development
- 17:56 Task #4379 (Closed): Design, code and test a new MN implementation.
- 17:56 Task #4380 (Closed): SSL Certificates
- 17:56 Task #4378 (Closed): Scope and plan implementation
- 17:56 Task #4376 (Closed): Create DataONE identity
- 17:56 Task #4377 (Closed): Create MN description document
- 17:56 Task #4375 (Closed): Integrate MN representatives with community
- 17:56 Task #4374 (Closed): Establish contact with potential MN organization
- 17:56 Task #4373 (Closed): Initial preparation
- 17:56 Task #4370 (Closed): Formal announcement
- 17:56 Task #4372 (Closed): MNDeployment: urn:node:KUBI 2014-03-13_19:04:55
- 17:56 Task #4368 (Closed): Create legal documents
- 17:56 Task #4369 (Closed): Create news item
- 17:56 Task #4367 (Closed): Final steps to go live
- 17:56 Task #4366 (Closed): Production verifications
- 17:56 Task #4365 (Closed): Mutual acceptance
- 17:56 Task #4364 (Closed): Update "Current MNs" webpage
- 17:56 Task #4363 (Closed): Transition to production.
- 17:56 Task #4361 (Closed): Review synchronization results
- 17:56 Task #4362 (Closed): Resolve any synchronization related issues
- 17:56 Task #4360 (Closed): Set up synchronization of the MN
- 17:56 Task #4359 (Closed): Synchronization
- 17:56 Task #4357 (Closed): Synchronization
- 17:56 Task #4358 (Closed): Register new Science Metadata formats
- 17:56 Task #4356 (Closed): Log Record access
- 17:56 Task #4354 (Closed): Science Data access
- 17:56 Task #4355 (Closed): Science Metadata access
- 17:56 Task #4353 (Closed): Authentication and Authorization
- 17:56 Task #4352 (Closed): Create Resource Maps for the data and metadata
- 17:56 Task #4349 (Closed): Verify that the Science Metadata is returned with the correct HTTP Content-Type
- 17:56 Task #4351 (Closed): Verify Science Metadata
- 17:56 Task #4350 (Closed): Science Metadata is available in Solr index
- 17:56 Task #4346 (Closed): Science Data
- 17:56 Task #4348 (Closed): Science Metadata
- 17:56 Task #4347 (Closed): Verify that the Science Data is returned with the correct HTTP Content-Type
- 17:56 Task #4344 (Closed): Set up Node document
- 17:56 Task #4345 (Closed): Content Review
- 17:56 Task #4343 (Closed): Verify successful installation of server side certificate
- 17:56 Task #4342 (Closed): Verify successful installation of client side certificate
- 17:56 Task #4341 (Closed): Generate urn:node:KUBI client certificate for development.
- 17:56 Task #4338 (Closed): Design, code and test a new MN implementation.
- 17:56 Task #4339 (Closed): SSL Certificates
- 17:56 Task #4340 (Closed): SSL Certificates for Development
- 17:56 Task #4335 (Closed): Create DataONE identity
- 17:56 Task #4336 (Closed): Create MN description document
- 17:56 Task #4337 (Closed): Scope and plan implementation
- 17:56 Task #4333 (Closed): Establish contact with potential MN organization
- 17:56 Task #4334 (Closed): Integrate MN representatives with community
- 17:56 Task #4332 (Closed): Initial preparation
- 17:56 Task #4329 (Closed): MNDeployment: urn:node:KUBI 2014-03-13_12:25:37
- 17:56 Task #4328 (Closed): MNDeployment: urn:node:KUBI 2014-03-13_12:23:53
- 17:56 Task #4331 (Closed): MNDeployment: urn:node:KUBI 2014-03-13_19:01:25
- 17:56 Task #4314 (Closed): MNDeployment: urn:node:KUBI 2014-03-12_23:29:01
- 17:56 Task #4327 (Closed): MNDeployment: urn:node:KUBI 2014-03-13_12:01:54
- 17:56 Task #4326 (Closed): MNDeployment: urn:node:KUBI 2014-03-13_12:00:35