Project

General

Profile

Task #8516

MNDeployment #8461: MEOW - Monitoring Ecosystems & Oceans in Wales

Story #8515: meow: Move to Production

meow: Implement in Production

Added by Amy Forrester almost 7 years ago.

Status:
New
Priority:
Normal
Assignee:
-
Target version:
-
Start date:
2018-03-22
Due date:
% Done:

0%

Story Points:

Description

Ensure that the production version of the MN is ready. This is either a new instance with production content, or the test instance that has been completely cleaned (content and logs).

  • ! Disable Sync if re-using test software !
  • Software Configurations / Node Document / System Metadata checks:
    • URI in node software config shows production version
    • If applicable, adapter metadata reflects production URI too.
    • System metadata reflects production URI
    • Target CN is production hostname.
  • Register Contact Subject identity in production version of DataONE LDAP w/ Sign in Link at https://search.dataone.org
  • D1 admin approves contact subject in production LDAP.
  • Request production certificates with prod version of URI and download w/ NCEAS uid. Install.

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 14.8 MB)