Project

General

Profile

Requirement #386

(Requirement) Deploy at least three Member Nodes

Added by Dave Vieglais over 14 years ago.

Status:
New
Priority:
Low
Assignee:
-
Target version:
-
Start date:
Due date:
% Done:

0%


Description

As part of the cooperative agreement, it is necessary for DataONE to stand up three Member Nodes by the end of the first year.

Rationale

This is a requirement of the CA. The intent is perhaps to demonstrate significant progress on the implementation of the proposed infrastructure.

Fit Criteria

  • Prototype member node functionality is designed
  • Targets for the prototype member nodes have been identified
  • Software implementations for the target member nodes are available
  • Deployed member nodes effectively participate in the DataONE cyberinfrastructure

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 14.8 MB)