Project

General

Profile

Story #3656

integration testing: what are acceptable pids for update?

Added by Rob Nahf almost 12 years ago. Updated almost 7 years ago.

Status:
New
Priority:
Normal
Assignee:
Category:
-
Target version:
-
Start date:
Due date:
% Done:

0%

Story Points:

Description

Update takes an originalPid as a parameter which is used to set the obsoletes and obsoletedBy fields for the two objects. Can the pid provided for that parameter be for an object that is:

a) archived - ?
b) reserved - should be no
c) deleted - ?
d) "current" but located on different MN

d) may be difficult to test, it would happen only when the original member node stops hosting the original - is no longer the authoritative node - but is still in service.

History

#1 Updated by Dave Vieglais almost 10 years ago

  • Project changed from Infrastructure to Test Resources
  • Category deleted (d1_integration)

#2 Updated by Dave Vieglais almost 7 years ago

  • Product Version set to *
  • Milestone set to None
  • Project changed from Test Resources to Infrastructure

#3 Updated by Dave Vieglais almost 7 years ago

  • Sprint set to Infrastructure backlog

#4 Updated by Dave Vieglais almost 7 years ago

  • Assignee changed from Rob Nahf to Roger Dahl

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 14.8 MB)