setup dataone hardware

Added by Nick Outin over 12 years ago. Updated over 12 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Category:
Hardware
Target version:
-
Start date:
2011-10-03
Due date:
2011-10-14
% Done:

100%

Estimated time:
24.00 h
Milestone:
None
Product Version:
*
Story Points:
Sprint:

Description

All hardware has arrived.

Done already:

  • Acquired racks and moved them across campus to CNSI server room
  • Racked all 20 array enclosures
  • Racked gigabit management switch.

Needs to be done:
* Rack servers and 10-GbE switches
* Cable storage with SAS cables
* Cable storage/servers/switches with SFP+ cables
* Acquire PDUs
* Cable everything with power cables
* Power everything up in the correct order
* Connect switches to CNSI network

History

#1 Updated by Nick Outin over 12 years ago

  • % Done changed from 50 to 70

Spent all of yesterday on campus working on the racks.

I...
* racked all the remaining hardware (servers and switches)
* cabled the storage arrays with their SAS cables (fault-tolerant cable option)
* picked up the PDUs, carted them across campus, and installed them in the racks
* installed power cables for all the storage and servers

Remaining work:
* connect switches to the PDUs
* network all the equipment with SFP+ and CAT6 cables (I need to order longer SFP+ cables)
* plug the PDUs into CNSI power
* connect the switches to campus

After that I can start configuring the servers/storage/switches

#2 Updated by Nick Outin over 12 years ago

  • Status changed from New to Closed

Also available in: Atom PDF