Project

General

Profile

Story #1793

Content checksums need to be verified after transfer

Added by Dave Vieglais over 13 years ago. Updated almost 13 years ago.

Status:
Closed
Priority:
Normal
Assignee:
-
Category:
-
Start date:
2011-09-15
Due date:
% Done:

100%

Story Points:
Sprint:

Description

When transferring content between any node (MN -> CN, MN <->MN), the checksum of the content MUST be checked to verify that an accurate copy of the content has been transferred.


Subtasks

Task #1794: Verify checksums of content transferred during synchronizationClosedRobert Waltz

Task #1795: Verify checksums of content transferred during replicationClosedBen Leinfelder

Task #1796: Verify checksums of content transferred during replication (GMN)ClosedRoger Dahl

History

#1 Updated by Dave Vieglais almost 13 years ago

  • Target version set to Sprint-2012.05-Block.1.3
  • Position set to 1

#2 Updated by Dave Vieglais almost 13 years ago

  • Target version changed from Sprint-2012.05-Block.1.3 to Sprint-2012.07-Block.1.4
  • Position deleted (19)
  • Position set to 48

#3 Updated by Roger Dahl almost 13 years ago

  • Status changed from New to Closed

Also available in: Atom PDF

Add picture from clipboard (Maximum size: 14.8 MB)